Monthly Archives: July 2017

Sargent & Lundy Showcases Expertise in Second License Renewal for Nuclear Power Plants; Engineering Ethics

Andrew Taylor July 28, 2017 – Sargent & Lundy is participating in the 2017 Utility Working Conference and Vendor Technology Expo (UWC) organized by the American Nuclear Society (ANS). The conference is taking place August 6-9 in Amelia Island, Florida. The … Continue reading

Posted in Homepage - News & Events, News, News Releases, Our People in Action | Comments Off on Sargent & Lundy Showcases Expertise in Second License Renewal for Nuclear Power Plants; Engineering Ethics

Sundt Generating Station Modernization

Print This Page Sundt Generating Station Modernization Project Tucson, Arizona Client: Tucson Electric Power Project Highlights: RICE Supplier/Model: Wärtsilä/18V50DF RICE Size: 10X18MW Fuel: natural gas TEP self-build project team: Tucson Electric Power — Owner; Sargent & Lundy Detailed design engineering, … Continue reading

Posted in Energy & Industrial, Projects | Comments Off on Sundt Generating Station Modernization

Enrico Fermi, Unit 3

Enrico Fermi Unit 3 Monroe County, Michigan USNRC Licensing Support for ESBWR 4,500 MWt Reactor Client: DTE Print This Page Project Highlights: Sargent & Lundy has two large dedicated servers (each with one terabyte of RAM) for seismic analysis. Using … Continue reading

Posted in Nuclear Power, Projects | Comments Off on Enrico Fermi, Unit 3

Sargent & Lundy to Present at 2017 IEEE PES General Meeting

Matt Cole July 14, 2017 – Sargent & Lundy is presenting at the IEEE Power & Energy Society (PES) General Meeting, which takes place in Chicago from July 16-20. Sargent & Lundy’s Vice President of Power Delivery Services Matt Cole is … Continue reading

Posted in News, News Releases, Our People in Action | Comments Off on Sargent & Lundy to Present at 2017 IEEE PES General Meeting

Maine Power Substation Additions

Maine Power Substation Additions Augusta, Maine Client: Central Maine Power Print This Page Project Highlights: Transmission line engineering and design Technical specifications for material and equipment Testing and commissioning Project Description: Sargent & Lundy is teaming with Cianbro Corp. (Pittsfield, ME) … Continue reading

Posted in Electric Grid Infrastructure, Projects | Comments Off on Maine Power Substation Additions

Inka Wind Power

Inka Wind Power Northern Peru Wind Farm Financing Support Client: ContourGlobal Project Highlights: 113 MW total, two sites Began commercial operation in 2014 62 Vestas V100-1.8 wind turbines Project Description: Sargent & Lundy was engaged as the independent engineer to … Continue reading

Posted in Projects, Renewable Energy | Comments Off on Inka Wind Power

Top Crop Wind Farm Project

Top Crop Wind Farm Pontiac, Illinois Client: Horizon Wind Energy, LLC Print This Page Project Highlights: Transmission line engineering and design Substation engineering and design Collection system engineering and design Material and equipment procurement support Construction field services Project Description: Sargent … Continue reading

Posted in Electric Grid Infrastructure, Projects, Renewable Energy | Comments Off on Top Crop Wind Farm Project