La Cygne Unit 2

Designed implementation for a selective catalytic reduction (SCR) sytem to meet air quality regulations


La Cynge Unit 2
La Cygne, Kansas
Client: Kansas City Power & Light

Print This Page


Project Highlights:

  • Powder River Basin (PRB) pulverized coal 85/15 blend / 715 MW
  • Boiler - Foster-Wheeler, induced draft
  • PSCR and Catalyst - Hitachi, high-dust design 3 + 1 configuration
  • Constructor - Kiewit
  • Overall Timeframe - 2011 – 2014

Project Description:

Sargent & Lundy’s overall work scope encompassed the detailed design of the structural steel and balance-of-plant (BOP) for the SCR retrofit. This included procurement of the SCR reactors and SCR ductwork. We were also responsible for all BOP design and procurement of all BOP equipment, including flue gas system modifications, ammonia supply, piles, concrete foundations, structural steel, electrical equipment, mechanical piping, etc.

The Unit 2 SCR retrofit was part of a larger EPC Air Quality Control System (AQCS) retrofit project for both Units 1 and 2. The overall AQCS retrofit included wet flue gas desulfurization (FGD) systems, distributed control system (DCS) conversions, and pulse-jet fabric filters. EPC detailed design began in 2011, and the EPC contractor, Kiewit, started construction in 2012.


Schedule Milestones:

  • Began detailed design: May 2011
  • Awarded SCR reactor: September 2011
  • Construction start: September 2012
  • Tie-in outage start: September 2014

Read more about our energy & industrial services.